![]() |
|
|
Click links below pictures to enlarge.
|
Campus Plan |
|
|
These drawings are the latest work of the Building Committee. The Phase 1 drawing shows what we plan to build in the first phase, planned for 2007. The Lobby renovation plan shows a conceptual view of how our new Lobby/Narthex might be designed and decorated. The Phase 2 drawing shows the planned completion of the Multipurpose space and classrooms on the main floor, in a future construction phase. Your Building Committee is anxious to hear from you. Please share your thoughts and comments with us. Sandy Brock BonnieCoultier Edwina Diehl Rick Drinski Jim Meyer Brian Johnson Pastor Chris John Schmidt Jenny Snow Peggy Nunley |
|
|
Previous Building Committee (powerpoint file) |