Lobby Renovation

Campus Plan

Phase 1 Conceptual

These drawings are the latest work of the Building Committee. The Phase 1 drawing shows what we plan to build in the first phase, planned for 2007.

The Lobby renovation plan shows a conceptual view of how our new Lobby/Narthex might be designed and decorated.

The Phase 2 drawing shows the planned completion of the Multipurpose space and classrooms on the main floor, in a future construction phase.